首页> 美国政府科技报告 >Why Programs Die: The Stand-Off Target Acquisition System (SOTAS) Case Study
【24h】

Why Programs Die: The Stand-Off Target Acquisition System (SOTAS) Case Study

机译:程序死亡的原因:对峙目标采集系统(sOTas)案例研究

获取原文

摘要

This paper looks at a real DoD weapons system that was terminated by Congress in1981. The paper reviews the origins of the program, and why it was killed. The author's research shows that a number of mistakes were made, both by the Government and Motorola, the prime contractor. The author cites specific mistakes made by the Army Program Office, including acceptance of requirements from OSD that were not necessary, mistakes made by the source selection board in failing to adequately consider the difficulty in jumping from a component supplier to a systems integrator, and a poor bidding strategy by the contractor which made substantial overruns inevitable. The paper concludes with lessons learned for program managers, acquisition personnel and contractors in how to avoid the pitfalls that doomed the SOTAS program.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号