首页> 外文期刊>Journal of civil engineering and management >STUDY OF THE INFLUENCE OF METRO LOADS ON THE DESTRUCTION OF NEARBY BUILDINGS AND CONSTRUCTION STRUCTURES USING BIM TECHNOLOGIES
【24h】

STUDY OF THE INFLUENCE OF METRO LOADS ON THE DESTRUCTION OF NEARBY BUILDINGS AND CONSTRUCTION STRUCTURES USING BIM TECHNOLOGIES

机译:使用 BIM 技术研究地铁载荷对附近建筑物和施工结构破坏的影响

获取原文
获取原文并翻译 | 示例

摘要

The authors studied the influence of metro loads on the destruction of nearby buildings and construction structures with the help of BIM technologies in order to eliminate the human factor at the design stage. In the study, numerical modeling was carried out using the LIRA-SAPR software package, and dynamic loadings were set by the time integration technique. The suggested technique involved a nonlinear dynamic analysis conducted considering the time factor; the parameters of the stress-strain state (displacement, force, stress) were determined at each moment of exposure, changing the rigid characteristics of the building structures. The authors conducted a structural assessment of an unfinished construction facility, considering the vibrodynamic loads of the metro. Numerous models were adopted as the structural designs of buildings that consider various impact factors, such as nonlinear soil behavior and permanent action and the nature of dynamic loads. The comparison with experimental data confirmed the theoretical and computational parts of the developed technique. The study determined the vibrodynamic impact of the metro on the construction structures. Verification of the developed methodology based on BIM technologies was carried out by comparing the results of numerical experiments with the results of subsequent full-scale vibration tests.
机译:作者在 BIM 技术的帮助下研究了地铁载荷对附近建筑物和施工结构破坏的影响,以便在设计阶段消除人为因素。在该研究中,使用 LIRA-SAPR 软件包进行了数值建模,并通过时间积分技术设置了动态载荷。建议的技术涉及考虑时间因素进行的非线性动力学分析;应力-应变状态的参数(位移、力、应力)在每个暴露时刻确定,从而改变建筑结构的刚性特性。考虑到地铁的振动载荷,作者对未完工的建筑设施进行了结构评估。许多模型被用作建筑物的结构设计,这些模型考虑了各种影响因素,例如非线性土壤行为和永久作用以及动态载荷的性质。与实验数据的比较证实了所开发技术的理论和计算部分。该研究确定了地铁对建筑结构的振动动力学影响。通过将数值实验结果与随后的全面振动测试结果进行比较,对基于 BIM 技术开发的方法进行了验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号