首页> 中文学位 >Risk Management of the Building Construction Projects in Developing Countries–a Case Study of the Afghan Building Construction Projects
【6h】

Risk Management of the Building Construction Projects in Developing Countries–a Case Study of the Afghan Building Construction Projects

代理获取

目录

声明

1 Introduction

1.1 Introduction

1.2 Background of the Study

1.3 Afghanistan Construction Industry

1.4 Statement of Study Problem

1.5 Significance of Study

1.6 Research Questions

1.7 Objectives of Study

1.8 Structure of the thesis

2 Literature Review

2.1 Introduction

2.2 Building Construction Projects in Developing Countries

2.3 Construction Risk Management

2.4 Benefits of Construction Risk Management

2.5 Risk Management Process for Construction Projects

2.6 Risk Management Framework in Construction Industry

2.7 Project Life Cycle

2.8 Project Performance Scope

2.9 Risk Breakdown Structure (RBS)

3 Methodology

3.1 Introduction

3.2 Research Strategy

3.3 Methods and Materials

3.4 Survey Method

3.5 Questionnaire Structure

3.6 Data Collection Method

4 Data Collection and Analysis

4.1 Introduction

4.2 Data Analysis

4.3 Survey Response

4.4 Descriptive analysis of general respondents’ background information

4.5 Descriptive analysis of the second part of the questionnaire

5 Risk Assessment

5.1 Introduction

5.2 Risk Management Practice

5.3 Risk Management Development

5.4 Knowledge

5.5 Limitations or Barriers

5.6 Risk Factors

5.7 Likelihood Estimation

6 Conclusions and Suggestions

6.1 Conclusions

6.2 Suggestions

参考文献

Appendix A:Developing Countries

Appendix B:Questionnaire

致谢

展开▼

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号