首页> 外文期刊>Railway Technical Review >Commissioning the new Cologne-Rhine/Main high-speed line - a specialized view of systems-engineering challenges and achievements
【24h】

Commissioning the new Cologne-Rhine/Main high-speed line - a specialized view of systems-engineering challenges and achievements

机译:调试新的科隆莱茵/ Main高速生产线-系统工程挑战和成就的专业视图

获取原文
获取原文并翻译 | 示例
           

摘要

The business objective set for the new Cologne-Rhine/Main high-speed railway line of halving rail-travel times between the two conurbations around Cologne and Frankfurt was only possible with the introduction of a new generation of trains, and the only way of achieving it in an environmentally compatible manner was to opt for a route closely following the existing "A3" motorway. The resulting project for the trains, track and command and control systems, on the one hand, and the commissioning and approvals processes, on the other hand, led to challenges affecting the whole of system engineering in the development and completion of the new line.
机译:将科隆和法兰克福两个城市之间的铁路旅行时间减半的新科隆/莱茵/ Main高速铁路线的业务目标只有通过引入新一代火车才能实现,并且这是实现这一目标的唯一途径它以环保的方式选择紧跟现有“ A3”高速公路的路线。由此产生的火车,跟踪与指挥控制系统项目,一方面是试运行和审批过程,另一方面,带来了挑战,影响了新线路开发和完成中的整个系统工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号