【24h】

Braskem expects Delta PP plant to reach full capacity by end of 2021

机译:布斯基斯民营预计Delta PP工厂将在2021年底达到全部容量

获取原文
获取原文并翻译 | 示例

摘要

The polypropylene(PP) plant in La Porte Texas(US),which has nameplate capacity of 450K mt/y,began commercial production on Sept.20.The $750MM facility is able to produce impact copolymers,random copolymers,and homopolymer.In addition,the Delta plant will focus on cost effectiveness instead of producing large volumes of specialty materials.Despite being optimistic about the facility reaching nameplate capacity by the end of 2021,CEO of Braskem America Mark Nikolich notes that the Delta PP plant will likely face challenges such as temporary shutdowns.The company expects to allocate half of the Delta plant's output to North America but will focus on the US market over the next four to six months.Earlier,Brazilian petrochemical firm Braskem had to import PP from its operations in Brazil and Europe for its US operations.
机译:La Porte德克萨斯(美国)的聚丙烯(PP)厂拥有450K MT / Y的铭牌容量,于9月20日开始商业生产。750毫米的设施能够产生冲击共聚物,无规共聚物和均聚物。 此外,Delta工厂将重点关注成本效益,而不是生产大量的专业材料。在德拉克斯美克尼科希首席执行官截至2021年底,达到铭牌容量的设施持乐观态度达到铭牌能力。达达PP工厂可能面临挑战 如临时停工。公司预计将分配一半的三角洲工厂的产出到北美,但将关注未来四到六个月的美国市场。巴西石化公司布拉斯克人士必须从巴西的业务导入PP 欧洲的美国运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号