首页> 外文期刊>World Pumps >Refurbishment for a Bristol sewage plant
【24h】

Refurbishment for a Bristol sewage plant

机译:布里斯托尔污水处理厂的翻新工程

获取原文
获取原文并翻译 | 示例
           

摘要

A pump manufacturer has contributed to an extensive refurbishment of Ashton Avenue sewage pumping station, one of Wessex Water's largest and most critical facilities in the Bristol region. Included was the installation of three storm pumps and two dry-weather flow pumps, plus condition monitors, on time and under budget. Wessex Water's Ashton Avenue sewage pumping station near Bristol was originally commissioned in 1970 and was targeted for renovation by Wessex Water because of pressure put upon the site by a rising population. This was resulting in unsatisfactory intermittent discharges of diluted sewage from the sewerage network, which was occurring both during and after heavy rainfall.
机译:一家泵制造商为Ashton Avenue污水泵站的大规模翻新做出了贡献,该站是Wessex Water在布里斯托尔地区最大,最关键的设施之一。其中包括在预算内准时安装了三个暴雨泵和两个干旱天气流量泵,以及状态监测器。威塞克斯水务公司在布里斯托尔附近的Ashton Avenue污水泵站最初于1970年投入使用,由于人口不断增加,该厂的目标是由威塞克斯水务公司进行翻新。这导致在下大雨期间和大雨之后,污水排污网络间歇性排放污水的效果不理想。

著录项

  • 来源
    《World Pumps》 |2012年第543期|共2页
  • 作者

    Alan Burrows;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 泵;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号