首页> 外文期刊>The Military Engineer >Sealed and Delivered
【24h】

Sealed and Delivered

机译:密封并交付

获取原文
获取原文并翻译 | 示例
           

摘要

Lewis-McChord Air Force Base, Wash., is in the process of building. The Special Operations Forces (SOF) Aviation Battalion Education Center, a new 35,000-ft2 building that has applied for Leadership in Energy and Environmental Design Silver certification, needed to meet new U.S. Army Corps of Engineers (USACE) air barrier standard requirements. The facility was the first project the general contractor had constructed under the governments air barrier requirements, which so far had not been met at this level at Joint Base Lewis-McChord.
机译:华盛顿州的刘易斯·麦克乔德空军基地正在建设中。特种作战部队(SOF)航空营教育中心是一座新的35,000平方英尺的建筑,已申请能源与环境设计领导力银级认证,需要满足美国陆军工程兵团(USACE)的新空气屏障标准要求。该设施是总承包商根据政府的空气屏障要求建造的第一个项目,到目前为止,在路易斯·麦克乔德联合基地的这一水平上都没有实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号