首页> 外文期刊>Smart Grid, IEEE Transactions on >A Fast Adequacy Analysis for Radial Distribution Networks Considering Reconfiguration and DGs
【24h】

A Fast Adequacy Analysis for Radial Distribution Networks Considering Reconfiguration and DGs

机译:考虑重新配置和DGS的径向分配网络的快速充分性分析

获取原文
获取原文并翻译 | 示例

摘要

The current searching schemes in reliability evaluation of radial distribution systems require complicated and extensive codes, that contribute to the majority of the CPU times. This paper proposes a new one-step method operating with a set of binary descriptor matrices, replacing the searching, to calculate load and system reliability indices. In this technique, ‘fuse to branch’ and ‘switch to branch’ are introduced and employed to facilitate the solutions along with the use of bus-injection to branch-current matrices. In this approach, the cross-connects operation, islanding mode of small-scale DGs, and network constraints are also considered as part of the adequacy evaluation. The proposed technique is highly efficient for long-term distribution network planning and optimization where many cross-connects are involved. The proposed technique is applied to RBTS Bus 2 and 4, as well as a realistic 747-node distribution network. Results for the large distribution planning of the 747-node network demonstrate the computational time is reduced from 61 days using the traditional method to 4.6 hours based on the proposed technique.
机译:径向分布系统可靠性评估中的当前搜索方案需要复杂和广泛的代码,这有助于大多数CPU次数。本文提出了一种用一组二进制描述符矩阵操作的新的一步法,替换搜索,计算负载和系统可靠性指数。在该技术中,引入并采用“向分支机构的熔断器”和“切换到分支”,以便于使用总线喷射到分支电流矩阵的​​解决方案。在这种方法中,交叉连接操作,小规模DG的岛屿模式以及网络约束也被认为是充分性评估的一部分。该技术对于长期配送网络规划和优化涉及许多交叉连接的技术非常有效。所提出的技术应用于RBT总线2和4,以及逼真的747节点分配网络。 747节点网络的大分配规划结果证明计算时间从使用传统方法到4.6小时基于所提出的技术,从61天减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号