...
首页> 外文期刊>IEEE Transactions on Power Systems >Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation
【24h】

Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation

机译:利用小型远程水力发电的大型燃煤发电站黑启动的模拟和现场测试

获取原文
获取原文并翻译 | 示例
           

摘要

A method for utilizing remote hydro generation to restart a major coal-fired generating station is described. The author documents a comprehensive black start project. It includes considerations for a black start project, details of an analytical study, identification of critical factors, development and implementation of an actual black start test, comparison of field tests with the simulation results, and the required system modifications identified during the project.
机译:描述了一种利用远程水力发电来重新启动大型燃煤发电站的方法。作者记录了一个全面的黑启动项目。它包括对黑启动项目的考虑,分析研究的详细信息,确定关键因素,开发和实施实际的黑启动测试,将现场测试与仿真结果进行比较以及在项目期间确定所需的系统修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号