Black & Veatch faced unique design and construction challenges at both Dayton Power & Light (DP&L) Ohio sites when the CT-121 system, The first was constructing fiberglass vessels and internals in the field and attaching ducts of high nickel metal alloys (including internal and external alloy and fiberglass piping) to the fiberglass vessels. The heart of the process at all five DP&L units is a jet bubbling reactor (JBR) scrubber vessel. The vessel stands approximately 75 feet tall and measures approximately 87 feet in diameter. Moving the process slurries and water throughout the system entails 30,000 feet of pipe at Killen and 90,000 feet of pipe at the four Stuart units. Black & Veatch's design team worked along DP&L and with Chiyoda's experts to complete the installation.
机译:当CT-121系统在俄亥俄州Dayton Power&Light(DP&L)的两个地点上,Black&Veatch都面临着独特的设计和施工挑战。首先是在现场建造玻璃纤维容器和内部构件,以及连接高镍金属合金(包括内部和外部)的管道。外部合金和玻璃纤维管道)连接到玻璃纤维容器。在所有五个DP&L单元中,该过程的核心是射流鼓泡反应器(JBR)洗涤塔。该船高约75英尺,直径约87英尺。在整个系统中移动工艺浆液和水需要在Killen放置30,000英尺的管道,在四个Stuart单元放置90,000英尺的管道。 Black&Veatch的设计团队与DP&L以及Chiyoda的专家一起完成了安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号