首页> 外文期刊>Port Engineering Management >Shepherd Offshore move a mountain
【24h】

Shepherd Offshore move a mountain

机译:牧羊人近海搬山

获取原文
获取原文并翻译 | 示例

摘要

UK's Shepard Offshore has dug deep to achieve another major milestone in the multi-million pound development of Tyneside's Neptune Energy Park. A dredger took two months to move a mountain of silt from the riverbed next to the former Neptune shipyard so that deep-hulled vessels can now berth alongside the Park's 700 t heavy load-out pad. The company hopes that the improved facility will draw further business from Scotland's offshore oil and gas industries to North East England. Scooping out over 20,000 m~3 of silt has created an 8.5 m deep water berth at the 760 m long quay, enabling larger vessels to come alongside for the loading and off-loading of reel products, equipment, machinery and fabricated structures as well as mobilisation and demobilisation projects.
机译:英国的谢泼德海洋石油公司(Shepard Offshore)已深入挖掘,以实现泰恩赛德(Tyneside)耗资数百万英镑的海王星能源公园(Neptune Energy Park)的又一重大里程碑。挖泥船用了两个月的时间,从前海王星造船厂旁边的河床上移走了一片淤泥,以便深水船现在可以停泊在公园700吨重的卸货区旁边。该公司希望改进后的设施将进一步吸引从苏格兰的海上石油和天然气工业到英格兰东北的业务。挖出超过20,000 m〜3的淤泥,在760 m长的码头上创造了8.5 m的深水泊位,使较大的船只可以并排装载和卸载卷筒产品,设备,机械和预制结构,以及动员和复员项目。

著录项

  • 来源
    《Port Engineering Management》 |2013年第4期|18-18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号