首页> 外文期刊>Platts Energy Trader >Gas Transmission Northwest maintenance to cut WCA inflows through Kingsgate
【24h】

Gas Transmission Northwest maintenance to cut WCA inflows through Kingsgate

机译:西北天然气传输公司的维修将减少通过金斯盖特(Kingsgate)的WCA流入

获取原文
获取原文并翻译 | 示例

摘要

Gas Transmission Northwest pipeline will be performing extended maintenance on its Eastport Station 3 and Starbuck Station 7, located between Kingsgate and Stanfield, that will reduce cross-border capacity through Kingsgate as much as 0.3 Bcf/d to about 2.2 Bcf/d beginning March 10 and continuing through the end of the month.
机译:西北输气管道将对其位于金斯盖特和斯坦菲尔德之间的Eastport站3和星巴克站7进行扩展维护,这将从3月10日开始将通过金斯盖特的跨境运输能力降低0.3 Bcf / d至约2.2 Bcf / d。并持续到月底。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号