...
首页> 外文期刊>Power in Europe >Granadilla 2 inaugurated
【24h】

Granadilla 2 inaugurated

机译:西番果2开幕

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Endesa chairman Borja Prado inaugurated November 10 the second combined cycle unit at the Granadilla plant in the south of the Canary Island of Tenerife. The €270 million plant, which consists of two gas and one steam turbine, raises the plant's installed capacity by 230 MW to 743 MW. Endesa's total installed capacity on Tenerife is now 1,059 MW. Meanwhile coal-fired generation has soared in Spain this year, reports gridco REE. Plants that use imported coal generated 129% more to July than in the same period last year, while domestic coal-fired plants generated 110% more. Contrary to forecasts, Endesa will this year import 3.7 million tons of coal from Indonesia for its As Pontes plant.
机译:Endesa董事长Borja Prado于11月10日在特内里费岛加那利岛南部的Granadilla工厂举行了第二个联合循环装置的落成典礼。这座耗资2.7亿欧元的电厂由两台燃气轮机和一台蒸汽轮机组成,将电厂的装机容量从230 MW提高到743 MW。 Endesa在特内里费岛的总装机容量现在为1,059兆瓦。同时,据gridco REE报道,今年西班牙的燃煤发电量猛增。到七月份,使用进口煤炭的电厂的产量比去年同期增加了129%,而国内燃煤电厂的产量增加了110%。与预测相反,Endesa今年将为其印尼As Pontes工厂从印尼进口370万吨煤炭。

著录项

  • 来源
    《Power in Europe》 |2011年第613期|p.21|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号