机译:与多机构利益相关者和紧急状况的严重不确定性一起在阿富汗优先进行基础设施投资
Univ. of Virginia, Charlottesville, VA 22904;
George Mason Univ., Fairfax, VA;
Maj., U.S. Army, Fort Leavenworth, KS;
U.S. Dept. of Defense, Washington, DC;
International Development, Washington, DC;
Development Center, Construction Engineering Research Laboratory, Champaign, IL;
U.S. Dept. of State, Washington, DC;
Development Center, Construction Engineering Research Laboratory, Champaign, IL;
Development Center, Construction Engineering Research Laboratory, Champaign, IL;
STRATCON LLC, Woodbridge, VA;
Development Center, Environmental Laboratory, 696 Virginia Rd., Concord, MA 01742;
robust decision making; infrastructure systems; multiple criteria decision analysis; risk analysis; systems engineering; uncertainty analysis; sustainable development;
机译:具有利益相关者分歧标准的能力投资项目的优先级,以协调基础设施的发展
机译:发展中国家基础设施优先排序中的紧急情况和多准则分析
机译:使用实物期权分析对高度不确定性的基础设施投资进行排序
机译:突发情况多变的阿富汗可持续基础设施计划(ASIP)的决策分析
机译:稳健的气候变化适应投资的优先级框架:支持不确定性下的运输基础设施决策。
机译:CTSA在利用分布式研究基础架构吸引不同利益相关者参与新兴研究政策制定中的作用
机译:争取实现阿富汗的全民覆盖:多方利益相关者对社区卫生工作者系统中能力投资的评估