首页> 外文期刊>International Journal of Project Management >Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia
【24h】

Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia

机译:将项目健康状况与项目绩效指标联系起来:沙特阿拉伯建筑项目的多个案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

This research presents an empirical study of the relationship between project health and project performance in the project delivery context. Based on an existing Project Health Check (PHC) framework, the relationship has been tested in terms of a set of predefined indicators through the use of case study approach. The Swiss Cheese model was employed as a guiding principle to represent the links between PHC indicators and project Key Performance Indicators (KPIs). Three cases of construction projects in Saudi Arabia were investigated through a comprehensive review of the project performance history, using current performance indicators to establish the first slice of the Swiss Cheese model. PHC assessments were then conducted to shape the second slice of the model, which represent the maturity level of the project management. The relationships between the two slices were obtained from semi-structured interviews with the project managers. These relationships were analysed qualitatively by tracking patterns across the three cases. The result was used to develop the Swiss Cheese Performance Management Framework, which can potentially serve to help project managers identify the root causes of any shortcomings at the early stage in the project delivery process. This in turn can assist project managers in managing the overall project performance more effectively.
机译:这项研究提出了在项目交付环境中项目健康与项目绩效之间关系的实证研究。基于现有的项目运行状况检查(PHC)框架,已通过案例研究方法根据一组预定义指标对这种关系进行了测试。瑞士奶酪模型被用作代表PHC指标和项目关键绩效指标(KPI)之间联系的指导原则。通过对项目绩效历史进行全面回顾,调查了三个沙特阿拉伯建筑项目案例,使用当前绩效指标来建立瑞士奶酪模型的第一部分。然后进行PHC评估,以塑造模型的第二部分,代表了项目管理的成熟度。这两个部分之间的关​​系是从与项目经理进行的半结构化访谈中获得的。通过跟踪这三种情况下的模式,对这些关系进行了定性分析。结果被用于开发“瑞士奶酪绩效管理框架”,该框架可潜在地帮助项目经理在项目交付过程的早期阶段确定任何缺陷的根本原因。反过来,这可以帮助项目经理更有效地管理整个项目绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号