...
首页> 外文期刊>International Journal of Applied Management Sciences and Engineering >Risks of Using Statistical Analysis Tools in Project Management Environments
【24h】

Risks of Using Statistical Analysis Tools in Project Management Environments

机译:在项目管理环境中使用统计分析工具的风险

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this study is to examine the risks of using statistical tools in a project basis. A systematic search of certain academic databases has been conducted for this study. Statistical tools could be used in a project, and they should be properly planned and designed. Statistical tools include major activities, such as collecting and analyzing data, providing meaningful interpretation, and reporting findings. When dealing with statistical tools, there are several risks that may exist and impact the project either positively or negatively. This study covers a brief outline of the risk management, statistical tools, and the relationship between the two concepts. Finally, a discussion of the common type of risks that are initiated by using statistical analysis tools are provided, which could be planned, identified, and analyzed in the early stages of the project.
机译:本研究的目的是在项目的基础上检查使用统计工具的风险。 已经为这项研究进行了对某些学术数据库的系统搜索。 可以在项目中使用统计工具,并应适当计划和设计。 统计工具包括主要活动,例如收集和分析数据,提供有意义的解释和报告调查结果。 在处理统计工具时,存在多种风险可能存在并对项目产生积极或负面影响。 本研究涵盖了风险管理,统计工具和两个概念之间的关系的简要概述。 最后,提供了通过使用统计分析工具启动的常见风险的讨论,可以在项目的早期阶段进行计划,鉴定和分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号