首页> 外文期刊>IEEE Transactions on Robotics and Automation >An approximation schema for the estimation of buffer sizes for manufacturing facilities
【24h】

An approximation schema for the estimation of buffer sizes for manufacturing facilities

机译:用于估算制造设施缓冲区大小的近似方案

获取原文
获取原文并翻译 | 示例

摘要

A unified approach to the production planning and scheduling problem of a flexible manufacturing system with failure-prone machines is considered. The proposed method is based on the concept of Gershwin's hedging point strategy. A hierarchical controller is proposed in which the upper levels use an inventory hedging point for production planning. At the lower level of the controller the concept of a buffer hedging point is introduced and used to obtain the size of the machine buffers and to derive the schedule for the manufacturing system. The estimation of the buffer size is not based on any optimization procedures; instead, it relies on an argument that allows decoupling of the operation of every machine. The net result is a hedging point concept that is applicable to all levels of the hierarchy. It is also shown how the buffer hedging point concept is related to the just-in-time manufacturing strategy. Results are presented from a small, scaled-down computer-controlled flexible manufacturing system and from several simulated cases.
机译:考虑了采用易故障机器的柔性制造系统的生产计划和调度问题的统一方法。所提出的方法基于Gershwin的对冲点策略的概念。提出了一种分级控制器,其中上级使用库存对冲点进行生产计划。在控制器的较低级别,引入了缓冲区对冲点的概念,并用于获取机器缓冲区的大小并得出制造系统的计划。缓冲区大小的估计不基于任何优化过程;相反,它依赖于一个参数,该参数允许将每台机器的操作解耦。最终结果是适用于层次结构所有级别的对冲点概念。还显示了缓冲区对冲点概念与即时制造策略的关系。结果是从小型,按比例缩小的计算机控制的柔性制造系统和一些模拟案例中得出的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号