首页> 外文期刊>ASTM Standardization News >Building on Reliability: Reliability Test Planning, Part 3
【24h】

Building on Reliability: Reliability Test Planning, Part 3

机译:建立可靠性:可靠性测试规划,第3部分

获取原文
           

摘要

A In Parts 1 and 2 of this series,link.description.footnote1-2 we discussed zero-failure test plans that do not depend on any distributional assumptions and similar plans that use the Weibull distribution as the model for the failure mode. In both cases, a zerofailure criteria was used. Here, we continue to use the Weibull distribution but also allow for one or more failures in the plan. Readers unfamiliar with Parts 1 and 2 of this series are encouraged to read the first two articles for basic background information, including terminology and details of the Weibull distribution.
机译:本系列的第1和第2部分,Link.description.footnote1-2我们讨论了零故障测试计划,这些计划不依赖于使用Weibull分布作为失败模式模型的任何分布假设和类似计划。 在这两种情况下,使用零尾部标准。 在这里,我们继续使用Weibull分布,但也允许在计划中进行一个或多个故障。 鼓励读者不熟悉本系列的第1和第2部分,以阅读基本背景信息的前两个文章,包括术语和威布尔分布的细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号