首页> 外文期刊>Archives of civil engineering >Original Model for Estimating the Whole Life Costs of Buildings and its Verification
【24h】

Original Model for Estimating the Whole Life Costs of Buildings and its Verification

机译:估算建筑物的整个生命成本及验证的原始模型及其验证

获取原文
           

摘要

The model for estimating the whole life costs of the building life cycle that allows the quantification of the risk addition lets the investor to compare buildings at the initial stage of planning a construction project in terms of the following economic criteria: life cycle costs (LCC), whole life costs (WLC), life cycle equivalent annual costs (LCEAC) and cost addition for risk (??RLCC). The subsequent stages of the model development have been described in numerous publications of the authors, while the aim of this paper is to check the accuracy of the model in the case of changing the parameters that may affect the results of calculations. The scope of the study includes: comparison of the results generated by the model with the solutions obtained in the life cycle net present value method (LCNPV) for time and financial input data, not burdened with the risk effect; the analysis of the variability of results due to changes in input data; analysis of the variability of results as a consequence of changing the sets of membership functions for input data and methods for defuzzification the result.
机译:估算建筑物生命周期的整个生命成本的模型,允许投资者在落后的经济标准方面将投资者比较建筑项目的初始阶段:生命周期成本(LCC) ,整个生命成本(WLC),生命周期等效年度成本(LCEAC)和风险成本增加(?? RLCC)。在作者的许多出版物中已经描述了模型开发的后续阶段,而本文的目的是在改变可能影响计算结果的参数的情况下检查模型的准确性。该研究的范围包括:模型与在生命周期净值净值方法(LCNPV)中获得的溶液产生的结果的比较,用于时间和财务输入数据,不受风险效果的负担;由于输入数据的变化而导致的结果的变化分析;分析结果变化的结果,以改变输入数据和方法的隶属函数和Defuzzzize的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号