首页> 外文期刊>Journal of Engineering Research >Project schedule with alternative activities and relationships
【24h】

Project schedule with alternative activities and relationships

机译:具有替代活动和关系的项目进度表

获取原文
           

摘要

The complexity arising from planning large-scale construction projects often requires representation and evaluation of alternative programs. However, prevailing schedule tools seldom consider and explicitly represent the alternative activities and relationships for further evaluation. Moreover, how to deal with the temporal relationships associated with alternative activities are also inadequately explored. A Mixed Integer Linear Programming model is developed to represent the alternative construction programs, and then the concept of criticality of activities is extended to incorporate the alternative relationships. The computation example and the case study demonstrate that project period and the optimal sequence of activities can be derived using the developed model.
机译:计划大型建设项目而产生的复杂性通常要求对替代程序进行表示和评估。但是,现行的进度计划工具很少考虑并明确表示可供进一步评估的替代活动和关系。此外,还没有充分探讨如何处理与替代活动相关的时间关系。开发了混合整数线性规划模型来表示替代构造程序,然后将活动的关键性概念扩展为包含替代关系。计算实例和案例研究表明,使用开发的模型可以得出项目周期和最佳活动顺序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号