MULTI-SKILLED RESOURCES SCHEDULING OF GAS COMPRESSOR STATION COMMISSIONING PROJECTS WITH ALTERNATIVE ACTIVITY CHAINS IN FUZZY CONDITIONS

机译:在模糊条件下具有替代活动链的气体压缩机站调试项目的多技术资源调度

获取原文
获取原文并翻译 | 示例

摘要

Multi-Skill Manpower Constrained Project Scheduling Problem suggested with alternative Activity Chains for gas compressor station commissioning and Start-up project to select one alternative activity chain from each alternative set, schedule selected activities, and allocating multi-skill manpower to these activities. Li's two-phase approach is used to convert the model into crisp single objective problem. Also, a meta-heuristic based on the Genetic Algorithm is developed for a large scale. Results derived from the solved model reply efficiently employer's objectives and employees' preferences based on minimum delay in project completion time and minimum deviation of working days determined at the beginning of planning.
机译:多技能人力限制项目调度问题建议,用于气体压缩机站调试和启动项目的替代活动链,从每个替代集合,计划选定的活动以及分配了这些活动的各个替代活动,以及分配多项技能人力。李的两相方法用于将模型转换为清晰的单身目标问题。此外,基于遗传算法的荟萃启发式是为大规模开发的。结果源于所解决的模型,基于项目完成时间的最小延迟和在规划开始时确定的工作日的最小偏差,有效地求助雇主的目标和员工的偏好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号