首页> 外文期刊>Sadhana >Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system
【24h】

Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system

机译:晶圆制造系统仿真模型中不同输入的调查和新的发布策略

获取原文
           

摘要

This paper investigates the effect of different inputs on selected performance metrics such as cycle time, WIP level and throughput in the processes of semiconductor wafer fab by developing a simulation model of representative but fictitious semiconductor wafer fab. The different inputs include arrival rate, arrival distribution, processing time, maintenance schedule, operator schedule, batch size, dispatching rule and release policy. Simulation results show that the relationship between inputs and system performance metrics, consideredin this study, are extremely complex particularly for the inputs maintenance schedule, operator schedule and batch size. An overall result shows that dispatching rule and closed loop release policy can significamtlyimprove the performance of wafer fabrication system. However; major improvement comes from closed loop release policy. Accordingly, this paper presents a new closed loop release policy called as constant batchmachine workload (CONSTBWL) to improve the performance of wafer fab. The behaviour of CONSTBWL is analysed in combination with dispatching rules using the proposed simulation model for wafer fab. Simulation results show that CONSTBWL policy outperformed traditional release policies in terms of the average cycle time, the work in process (WIP) level and the standard deviation of WIP level under a prescribed throughput level. Furthermore, the analysis of the results indicated that a good shop floor performance can be achieved witha right combination of closed loop release policy and simple dispatching rules with respect to the choice of performance metrics.
机译:本文通过建立具有代表性的虚拟半导体晶圆厂的仿真模型,研究了不同输入对所选性能指标的影响,例如循环时间,WIP水平和半导体晶圆厂工艺中的吞吐量。不同的输入包括到达率,到达分布,处理时间,维护计划,操作员计划,批次大小,调度规则和发布策略。仿真结果表明,在这项研究中,投入与系统性能指标之间的关系非常复杂,特别是对于投入维护计划,操作员计划和批量大小而言。总体结果表明,调度规则和闭环释放策略可以显着提高晶片制造系统的性能。然而;重大改进来自闭环发布策略。因此,本文提出了一种新的闭环释放策略,称为恒定批处理机工作量(CONSTBWL),以提高晶圆厂的性能。利用所提出的晶圆厂仿真模型,结合调度规则对CONSTBWL的行为进行了分析。仿真结果表明,在规定的吞吐量水平下,CONSTBWL策略在平均周期时间,在制品(WIP)级别和WIP级别的标准偏差方面优于传统的发布策略。此外,对结果的分析表明,就性能指标的选择而言,闭环释放策略和简单的调度规则的正确组合可以实现良好的车间性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号