首页> 外文期刊>R & D 神戶製鋼技報 >上工程集約に伴う加古川製鉄所第2分塊工場の増強
【24h】

上工程集約に伴う加古川製鉄所第2分塊工場の増強

机译:通过合并上层工序,加强了加古川第二工厂的加工厂

获取原文
           

摘要

In November 2017, a decision was made to shut down the upstream operations(from blast furnace tocontinuous casters) of the Kobe Works and to consolidate these operations at the Kakogawa Works.Prior to the consolidation, the capacity of the No.2 Bloom Mill at the Kakogawa Works was enhancedto establish the system for supplying billets to the wire rod mill and the bar mill in the Kobe Works.The enhancement involved adding furnaces, revamping the continuous billet mill, and expanding thecooling tables and billet yard. These facilities were launched in January 2017 and have been operatingsmoothly since then.
机译:2017年11月,公司决定关闭神户工厂的上游业务(从高炉到连铸机),并在神古川工厂对其进行合并。加强了神古制铁所的线材轧机和棒材轧机的方坯供应系统,增加了炉子,改造了连续方坯轧机,扩大了冷却台和方坯场。这些设施于2017年1月启动,自那时以来一直运行平稳。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号