...
首页> 外文期刊>Concrete >Three climbing solutions for Brighton 3Ts hospital redevelopment
【24h】

Three climbing solutions for Brighton 3Ts hospital redevelopment

机译:布莱顿3TS医院重建的三种攀岩解决方案

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Currently under construction is the south-east quarter of the hospital. The development will become the larger of the two new buildings planned for this project and will provide specialist tertiary, trauma and teaching facilities. It is the largest capital programme at the hospital since it first opened in 1828.Doka provided formwork and shoring solutions for this large-scale project using a mix of climbing equipment, including MF240, D15 Dam brackets, shaft platforms in addition to supporting A-Frames with Framax Xlife systemised wall formwork or the lightweight alternative, Alu-Framax Xlife.
机译:目前正在建设中是医院的东南部。该开发将成为该项目计划的两个新建筑物中的较大人物,并将为专业的第三大,创伤和教学设施提供。它是医院最大的资本计划,因为它于1828年首次开业。Doka提供了使用攀爬设备的混合设备的大型项目的模板和支撑解决方案,包括MF240,D15坝括号,轴平台,以及配套带有Framax XLife系统化的墙壁模板或轻量级替代品,Alu-Framax XLife 。

著录项

  • 来源
    《Concrete》 |2020年第1期|22-24|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号