...
首页> 外文期刊>Petroleum Geoscience >Redevelopment of the brighton marine field, trinidad … the early days
【24h】

Redevelopment of the brighton marine field, trinidad … the early days

机译:特立尼达的布莱顿海洋领域的重建……初期

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In October 1999, the Brighton Marine Block was awarded to Venture Production Company Trinidad Limited and Petrotrin, the Trinidadian National Oil Company, with Venture as operator. The challenges to improved field recovery posed by such a complex field, with more than 50 years of production history, are many. The field has potential, but requires new interpretations and ideas based on both new and old datasets,a phased programme of rehabilitation and a long-term development plan that will generate immediate value without compromising long-term oil production. Discovered in 1951, the Brighton Marine Field has produced almost 58 X 10~6 STB from an oil in place of over 500 X 10~6 STB. Production peaked at 14 000 BOPD in 1967 but had not exceeded 1000 BOPD since 1983. Some 275, mostly deviated, wells were drilled into the field from 11 onshore pads and 9 offshore platforms. In the year since Venture assumed operations, production rose to nearly 2000 BOPD through field infrastructure rehabilitation, well workovers and the implementation of new field management processes. In early 2001, the first new well proved the presence of a commercial quantity of petroleum in a hitherto undepleted part of the field. It is very early in the rehabilitation process and much remains uncertain, but significant progress has been made in understanding the field and tapping its full potential. The field's first 3D seismic survey, acquired in 1997, has provided a significant enhancement to the understanding of a structurally and stratigraphically complex field. The field compartmentalization and 50 years of production,have complicated the distribution of pressures, sweep and compaction. In order to mitigate risks, a phased strategy was implemented. This process focuses initially in the most straightforward, cost-effective opportunities. These redevelopments are designed to maximize data collection, test new models and help finance more extensive developments. Already, this approach is starting to yield results, although it is still early days.
机译:1999年10月,布莱顿海洋区块被授予特立尼达有限公司和特立尼达国家石油公司Petrotrin的风险生产公司,并由Venture担任运营商。拥有50多年生产历史的如此复杂的油田对提高油田采收率提出了许多挑战。该领域具有潜力,但需要基于新旧数据集的新解释和新想法,分阶段的恢复计划和长期发展计划,这将在不损害长期石油产量的情况下产生即时价值。布赖顿海洋油田(Brighton Marine Field)发现于1951年,它用一种油代替了500 X 10〜6 STB,生产了将近58 X 10〜6 STB。产量在1967年达到峰值,达到14 000 BOPD,但自1983年以来没有超过1000 BOPD。从11个陆上垫层和9个海上平台上钻了大约275口井,大部分是偏斜井。自从Venture投入运营以来的那一年,通过现场基础设施修复,修井和实施新的现场管理流程,产量已增至近2000 BOPD。在2001年初,第一口新井证明了该油田迄今尚未耗尽的部分中有大量商业石油。现在还处于恢复过程的早期,仍然存在很多不确定性,但是在了解该领域和挖掘其全部潜力方面已经取得了重大进展。该领域的首个3D地震勘探于1997年获得,大大增强了对结构和地层复杂领域的理解。现场分隔和50年的生产使压力分布,扫掠和压实变得复杂。为了减轻风险,实施了分阶段的策略。此过程最初侧重于最直接,最具成本效益的机会。这些重新开发旨在最大程度地收集数据,测试新模型并帮助资助更广泛的开发。尽管仍处于初期阶段,但这种方法已经开始产生结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号