首页> 外文期刊>Computers & Industrial Engineering >Operator assignment in a labor-intensive manufacturing cell considering inter-cell manpower transfer
【24h】

Operator assignment in a labor-intensive manufacturing cell considering inter-cell manpower transfer

机译:考虑单元间人力转移的劳动密集型制造单元中的操作员分配

获取原文
获取原文并翻译 | 示例

摘要

This research deals with an operator assignment problem in which inter-cell manpower transfer is taken into consideration. A two phase methodology is proposed to minimize the total manpower required. In the first phase, integer programming is proposed to find the optimal configuration for allocation of tasks to workstations, and for each workstation one operator is assigned. The second phase uses mixed-integer programming to minimize the manpower required based on the results of the first phase. In addition, for the purpose of comparison, integer programming is also proposed for the situation where inter-cell manpower transfer is not allowed. A case study from a bicycle assembly company is introduced. The experimental results show that the proposed methodology can save manpower and improve manpower efficiency. Moreover, it also shows the promise of the method in solving practical applications.
机译:这项研究解决了一个运营商分配问题,其中考虑了小区间的人力转移。提出了一种两阶段方法来最小化所需的总人力。在第一阶段,提出整数编程以找到用于将任务分配给工作站的最佳配置,并为每个工作站分配一个操作员。第二阶段使用混合整数编程,以根据第一阶段的结果将所需的人力最小化。另外,出于比较的目的,对于不允许小区间人力转移的情况,还提出了整数编程。介绍了一个自行车装配公司的案例研究。实验结果表明,该方法可以节省人力,提高人力效率。而且,它也显示了该方法在解决实际应用中的希望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号