Tunneling Work Begins on San Diego Pipeline

机译:圣地亚哥管道上的隧道工作开始

获取原文
获取原文并翻译 | 示例
           

摘要

Since the late 1980s, the San Diego County Water Authority (SDCWA) has been implementing a number of improvements to the system of pipelines it uses to import water and distribute it throughout the county. Chief among these activities is the Emergency Storage Project, an effort to link the county's reservoirs and pipelines to improve the network's operational flexibility and ensure its reliability in the event of a natural disaster. In June one of the project's major components-the 11 mi (18 km) long San Vicente Pipeline-achieved a key milestone as construction crews began operating tunnel-boring machines (TBMS) along the pipeline's alignment.
机译:自1980年代后期以来,圣地亚哥县水务局(SDCWA)对其进口水和在整个县内分配水的管道系统进行了许多改进。这些活动中的主要活动是紧急存储项目,该项目旨在连接县的水库和管道,以提高网络的操作灵活性,并在发生自然灾害时确保其可靠性。 6月,该项目的主要组成部分之一(长11英里(18公里)的圣维森特管道(San Vicente Pipeline)达到了一个重要的里程碑,因为施工人员开始沿管道的路线操作隧道掘进机(TBMS)。

著录项

  • 来源
    《Civil Engineering》 |2006年第8期|p.29-30|共2页
  • 作者

    Jay Landers;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号