首页> 外文期刊>Building and Environment >Optimization of dust removal performance of ventilation system in tunnel constructed using shield tunneling machine
【24h】

Optimization of dust removal performance of ventilation system in tunnel constructed using shield tunneling machine

机译:盾构隧道机建造隧道通风系统除尘性能的优化

获取原文
获取原文并翻译 | 示例

摘要

Dust that is produced when a tunnel is being constructed using a shield tunneling machine is an important factor that affects the operating environment. A ventilation dust removal system is an effective tool for suppressing the diffusion of such dust particles. In this study, the operating process of the ventilation dust removal system of a shield tunneling machine was analyzed. Subsequently, through an orthogonal test, the effects of pressurized air flow rate, air extraction flow rate, and diameter of pressurized air duct on dust control distance are investigated in depth. Specifically, Factor A (pressurized air flow rate) imposed the most significant effect on the dust control distance, followed by Factor B (air extraction flow rate), and finally by Factor C (diameter of pressurized air duct). The optimal combination was determined as A(1)B(4)C(3). On applying this optimal combination, the dust control distance of the ventilation dust removal system was 23.54 m, which was 30.11 m shorter than that of the original ventilation system. Therefore, using this optimal ventilation system, the dust that is produced can be controlled around the main engine, and the dust control performance can be improved considerably.
机译:使用屏蔽隧道机构造隧道时产生的灰尘是影响操作环境的重要因素。通风除尘系统是用于抑制这种粉尘颗粒的扩散的有效工具。在本研究中,分析了屏蔽隧道机的通风除尘系统的操作过程。随后,通过正交试验,深入研究加压空气流量,空气提取流量,空气提取流量和加压空气管道上的效果。具体地,因子A(加压空气流速)对灰尘控制距离产生的最显着影响,其次是因子B(空气提取流量),最后是因子C(加压风管的直径)。确定最佳组合为(1)b(4)c(3)。在应用这种最佳组合时,通风除尘系统的灰尘控制距离为23.54米,比原始通风系统短30.11米。因此,使用这种最佳通风系统,可以围绕主发动机控制产生的灰尘,并且可以显着提高灰尘控制性能。

著录项

  • 来源
    《Building and Environment》 |2020年第4期|106745.1-106745.13|共13页
  • 作者单位

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

    Northeast Elect Power Univ Sch Mechn Engn Jilin 132000 Jilin Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

    Shandong Univ Sci & Technol State Key Lab Min Disaster Prevent & Control Cofo Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Minist Sci & Technol Qingdao 266590 Peoples R China|Shandong Univ Sci & Technol Coll Min & Safety Engn Qingdao 266590 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Shield tunneling machine; Ventilation for dust removal; Numerical simulation; Orthogonal test; Optimal distance;

    机译:屏蔽隧道机;除尘的通风;数值模拟;正交试验;最佳距离;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号