首页> 外文期刊>Automation Science and Engineering, IEEE Transactions on >Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis
【24h】

Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis

机译:具有恒定机器人移动时间的多集群工具的最优调度,第一部分:两集群分析

获取原文
获取原文并翻译 | 示例

摘要

In semiconductor manufacturing, finding an efficient way for scheduling a multicluster tool is critical for productivity improvement and cost reduction. This two-part paper analyzes optimal scheduling of multicluster tools equipped with single-blade robots and constant robot moving times. In this first part of the paper, a resource-based method is proposed to analytically derive closed-form expressions for the minimal cycle time of two-cluster tools. We prove that the optimal robot scheduling of two-cluster tools can be solved in polynomial time. We also provide an algorithm to find the optimal schedule. Examples are presented to illustrate the proposed approaches and formulations.
机译:在半导体制造中,寻找一种有效的方法来调度多集群工具对于提高生产率和降低成本至关重要。分为两部分的论文分析了配备单刀片机器人和恒定机器人移动时间的多集群工具的最佳调度。在本文的第一部分中,提出了一种基于资源的方法,以分析方式导出两类工具的最小循环时间的闭式表达式。我们证明可以在多项式时间内解决两团工具的最佳机器人调度问题。我们还提供了一种算法,可以找到最佳计划。举例说明了所提出的方法和公式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号