...
首页> 外文期刊>IEEE Transactions on Applied Superconductivity >Preparations for pulse operation tests of the ITER CS model coil using the JT-60 power supply
【24h】

Preparations for pulse operation tests of the ITER CS model coil using the JT-60 power supply

机译:使用JT-60电源进行ITER CS模型线圈的脉冲操作测试的准备

获取原文
获取原文并翻译 | 示例
           

摘要

Some preparations for pulse operation tests of the ITER CS model coil in the JT-60 power supply system have been performed. Since the ITER CS model coil takes a longer current ramp-up time, the pulse duration is extended up to 70 s from 15 s by decreasing the output voltage of the motor-generator. In the protection system a new grounding resistor with higher resistance has been installed and a new protection make-switch has also been developed. An analysis for the local resonances in the coil has been performed, and measurements of the coil impedance is planned to confirm the validity of the analysis results.
机译:JT-60电源系统中的ITER CS模型线圈的脉冲操作测试的一些准备工作已经完成。由于ITER CS模型线圈需要较长的电流上升时间,因此通过降低电动发电机的输出电压,脉冲持续时间从15 s延长至70 s。在保护系统中,安装了具有更高电阻的新接地电阻,并且还开发了新的保护接通开关。已经对线圈中的局部谐振进行了分析,并且计划了线圈阻抗的测量以确认分析结果的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号