首页> 中文期刊> 《水力发电》 >中国特高拱坝建设特点与关键技术问题

中国特高拱坝建设特点与关键技术问题

         

摘要

The super-high arch dam in China has some basic characteristics of high height, wide river valley and large water thrust, and an objective factor of complex geological conditions. These specialties bring about some problems on dam body stress, abutment stability, dam concrete temperature control and crack prevention, slope and dam foundation treatment, and complicated stress during construction period. The solutions of these problems constitute the key technologies in the design and construction of super-high arch dam in China. For dealing with these problems, some special studies needing to be conducted systematically and in-depth are proposed herein, including design criteria, safety standard and evaluation, real ' operation state, failure probability and mechanism, risk feature, risk standard and anti-risk requirement, seismic safety and measures, dam concrete temperature control and crack prevention, geological defects treatment for dam foundation and abutment, new material and new processes.%我国特高拱坝具有坝高谷宽、水推力大的基本特点以及地质条件复杂的客观因素,由此引起的坝体应力、坝肩稳定、混凝土温控防裂、边坡及基础处理、施工期应力等构成我国特高拱坝设计建设的关键技术问题.针对未来特高拱坝建设所面临的问题,提出设计准则、安全标准和要求,真实工作性态、失效概率和破坏机理,特高拱坝风险特征、风险标准和抗风险要求,地震安全和抗震措施,坝体混凝土温度控制和防裂,坝基坝肩地质缺陷处理、新材料和新工艺等方面是特高拱坝需要进行系统深入研究的方向.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号