首页> 中文期刊>中国工程科学 >Project risk control of underground engineering geological disaster in pumped-storage power station

Project risk control of underground engineering geological disaster in pumped-storage power station

     

摘要

This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号