Combined with the subsidiary comprehensive building project of ICBC Shanxi branch,mainly described the features,technological process,construction method,quality control,safety measures of cast-in-place hollow floor slab,the floor slab structure of above ground fifteen floors used cast-in-place hollow beamless floor structure system,had good construction quality,gained the praise of construction units and related departments.%结合中国工商银行山西省分行附属综合楼工程,主要叙述了现浇空心楼板特点,工艺流程,施工方法,质量控制,安全措施,地上15层部分楼板结构采用现浇空心无梁楼盖结构体系,施工质量好,得到了建设单位和有关部门的好评。
展开▼