分析了沈阳地铁二号线断面客流的时空分布特征和运力匹配情况,提出了二号线在第十二届全运会期间存在的高峰期运力不足、上下行不均衡程度大等问题。根据全运会期间的客流特征,提出了全运会期间地铁二号线运输组织方案的优化研究。%With an analysis of the sectio n passenger flow distribution features of time space continuum, the matching condition between planning capacity and the actual transport volume of Shenyang metro Line 2, this article brings forward some potential problems of Line 2 during the 12th national games, such as the deficiency of train capacity in peak times, the serious imbalance of up and town traffic, and so on. The op-timization research on transportation organization plan of Line 2 during 2013 national games is presented according to the passenger character during the national games.
展开▼