首页> 外文会议>Transportation – investing in our future >ACCELERATING HIGHWAY BRIDGE DEMOLITIONAN INNOVATIVE APPROACH
【24h】

ACCELERATING HIGHWAY BRIDGE DEMOLITIONAN INNOVATIVE APPROACH

机译:加快公路桥梁的拆除和创新方法

获取原文
获取原文并翻译 | 示例

摘要

The Regional Municipality of York used a unique approach tornconstruction staging for a new interchange at Highway 404 and Elgin Mills Road, whichrnincluded the demolition of the existing two-span post-tensioned concrete bridgernstructure over the expressway within a single 12-hour night-time highway closure. Arnhighway closure was arranged to perform the bridge demolition from Saturday,rnDecember 13, 2003 at 10:00 p.m. to Sunday, December 14, 2003 at 10:00 a.m. so thatrnthe bridge could be demolished. As a result, traffic on Elgin Mills Road and onrnHighway 404 was impacted for only twelve hours of the entire two-year constructionrnperiod.
机译:约克地区自治市采用独特的方法在404号高速公路和埃尔金米尔斯路的新交汇处进行施工,其中包括在一条12小时夜间高速公路中拆除高速公路上现有的两跨后张混凝土桥结构。关闭。从2003年12月13日(星期六)下午10:00起,安排Arnhighway封闭工程进行桥梁拆除。到2003年12月14日(星期日)上午10:00,以便拆除这座桥。结果,在整个两年的建设期间中,埃尔金米尔斯路(Elgin Mills Road)和高速公路404上的交通只受到了十二个小时的影响。

著录项

  • 来源
  • 会议地点 Calgary(CA);Calgary(CA)
  • 作者

    Cynthia Martin; John P. Does;

  • 作者单位

    Regional Municipality of York, Transportation Department, Newmarket, ON, Canada;

    R.V. Anderson Associates Limited, Toronto, ON, Canada;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:25:08

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号