首页> 外文会议>Annual conference of the Transportation Association of Canada >ACCELERATING HIGHWAY BRIDGE DEMOLITION AN INNOVATIVE APPROACH
【24h】

ACCELERATING HIGHWAY BRIDGE DEMOLITION AN INNOVATIVE APPROACH

机译:加速公路桥拆迁创新方法

获取原文

摘要

The Regional Municipality of York used a unique approach to construction staging for a new interchange at Highway 404 and Elgin Mills Road, which included the demolition of the existing two-span post-tensioned concrete bridge structure over the expressway within a single 12-hour night-time highway closure. A highway closure was arranged to perform the bridge demolition from Saturday, December 13, 2003 at 10:00 p.m. to Sunday, December 14, 2003 at 10:00 a.m. so that the bridge could be demolished. As a result, traffic on Elgin Mills Road and on Highway 404 was impacted for only twelve hours of the entire two-year construction period.
机译:约克地区市政府利用了404号高速公路和埃尔金姆斯路新交汇处的独特方法,包括拆除现有的两跨在一夜之间的高速公路上的现有双跨度混凝土桥梁结构 - 时间高速公路关闭。一条公路关闭,安排了从2003年12月13日星期六下午10:00开始桥梁拆迁。到2003年12月14日星期日上午10:00。这样桥就可以拆除。因此,Elgin Mills路和404号高速公路上的交通仅为整个两年的施工期间的12小时受到影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号