The invention relates to the field of road construction, namely, the creation of artificial toll road constructions, in particular, road overpasses, bridges and overpasses. Declared modified bridge approach to toll road bridges comprising land embankment subgrade road which serves for entry into the underpass and exit from it vehicle, as well as for the item of charge (PVP), which is arranged on the elongated secondary portion embankment subgrade road , taken with the broadening of the carriageway. Said secondary portion joins the roadway of a bridge construction with the main portion of the roadway of the bridge approach, the profile of the carriageway on the additional portion is formed with a longitudinal bias of not more than 5% with respect to the horizontal. An elongate mound additional modified bridge approach portion has a length L2 that is greater than the length L1 of the working area PVP: L2 L1. Technical result of utility model is to improve road safety at the entrance to the PVP pay bridge structures and increase the capacity of the PVP by creating favorable conditions for the "start-stop" movement of vehicles waiting to enter the working PVP zone from modified bridge approach and reduced wear of the top of the road pavement.
机译:本发明涉及道路建设领域,即人工收费公路建设的创建,特别是道路立交桥,桥梁和立交桥。宣布了一种收费公路桥梁的改良桥方法,该收费公路桥梁包括用于进入地下通道和从其出入车辆的陆堤路基道路,以及用于设置在加长的第二部分路堤路基道路上的收费项目(PVP),随着车道的拓宽。所述次要部分将桥梁结构的道路与桥梁引道的主要部分连接起来,在附加部分上的车道轮廓形成为相对于水平方向的纵向偏差不超过5%。细长的土墩附加的改进的桥进入部分的长度L2大于工作区域PVP的长度L1:L2> L1。本实用新型的技术成果是通过为从改型桥进入工作PVP区的车辆的“起停”运动创造有利条件,提高PVP收费桥结构入口处的道路安全,提高PVP的通行能力。的方法,减少了路面顶部的磨损。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号