首页> 外文会议>Transportation and Development Institute congress;TDI Congress 2011 >Freight Traffic Crossing the Eastern Continental Divide
【24h】

Freight Traffic Crossing the Eastern Continental Divide

机译:货运量跨越东部大陆鸿沟

获取原文

摘要

This paper addresses the problem of moving wholesale and retail goods around the New York City Metropolitan Regional Area. The existing roadways, bridges, and tunnels have already exceeded their capacity, and the author has assumed that freight traffic will continue to grow at the same rate as the population. To address this problem, a freight railroad tunnel under the Hudson River should be constructed to interconnect the west side of the Hudson River to the entire New England Regional Area and also to Long Island. This proposed railroad freight tunnel connection could remove over 30,000 tractor trailers per day, or about 8 million trucks per year, from the congested roadway network and the Hudson River Crossings.
机译:本文解决了将批发和零售商品在纽约市大都会地区附近转移的问题。现有的道路,桥梁和隧道已经超出了其容量,并且作者假设货运量将继续以与人口相同的速度增长。为了解决这个问题,应该在哈德逊河下方建造一条货运铁路隧道,以将哈德逊河的西侧连接到整个新英格兰地区以及长岛。拟议中的铁路货运隧道连接每天可从拥挤的道路网络和哈德逊河道口中卸下30,000多辆拖拉机拖车,或每年约800万辆卡车。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号