首页> 外文会议>AACE international conference expo >The Role Owner Project Control Plays in Contract Administration
【24h】

The Role Owner Project Control Plays in Contract Administration

机译:合同管理中的角色所有者项目控制扮演

获取原文

摘要

As projects become larger and more complex, the owner's project control responsibilities take on a greater role in the overall project management spectrum. Many owner organizations capture the project control discipline under a project services group that incorporates project controls, contract development and contract administration, and other related project services. One reason for this organizational alignment is the close relationship project controls has with contract administration. Well-defined owner contract strategies and contract documents include the contractor's responsibility to report and manage their scope of work in the agreed upon manner. Project controls needs to make sure these operational protocols are being met and the project is on track against established contractual baselines. Another major project control responsibility, performed in conjunction with the project management team, is change management, which supports not only keeping the project on track but also claims avoidance. This paper will outline the details of a well-defined and well-aligned project control/contract administration set of roles and responsibilities.
机译:随着项目变得更大,更复杂,业主的项目控制职责在整体项目管理谱中取得更大的作用。许多所有者组织根据项目服务集团捕获项目控制学科,该集团融入项目控制,合同开发和合同管理以及其他相关项目服务。这个组织对齐的一个原因是密切关系项目控制与合同管理。明确定义的所有者合同战略和合同文件包括承包商有责任在商定的方式报告和管理其工作范围。项目控件需要确保正在满足这些运营协议,项目正在追踪既定的合同基线。另一项重大项目控制责任与项目管理团队一起进行,是改变管理,不仅支持将项目保持在轨道上,而且还支持避免避免。本文将概述一个明确定义和良好的项目控制/合同管理团体的角色和职责的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号