首页> 外文会议>Rapid Excavation and Tunneling Conference >High Cover TBM Tunneling in the Andes Mountains-A Comparative Study of Two Challenging Tunnel Projects in Chile
【24h】

High Cover TBM Tunneling in the Andes Mountains-A Comparative Study of Two Challenging Tunnel Projects in Chile

机译:High Cover TBM隧道在Andes山区 - 智利两个挑战隧道项目的比较研究

获取原文

摘要

The Andes Mountain range is among the youngest and most complex in the world, geologically speaking. Tunneling projects, particularly for hydroelectric and water transfer schemes, are not new to the range but their past history has met with mixed success. Two new projects utilizing very different tunnel boring machines and excavation strategies are now providing a testing ground for modern underground construction equipment in the Chilean Andes.This paper will analyze two projects: the Alto Maipo and Los Condores Hydroelectric Projects, located approximately 100 km apart in the Andes Mountains. The two strategies being employed will be analyzed in detail, as one project is using an open-type Main Beam TBM plus extensive ground support, while the other is utilizing a Double Shield TBM and segmental lining. The authors will look at TBM performance and ground conditions encountered in the two tunnels and what effects the TBM selection and ground support strategy may have had on each tunneling operation.
机译:山脉山脉是世界上最年轻,最复杂的地质上的地质上讲。隧道工程,特别是对于水力发电和水转度方案,对范围并不新鲜,但过去的历史已经满足了混合成功。利用非常不同的隧道镗床和挖掘策略的两个新项目现在正在为智利和智利的现代地下建筑设备提供测试场所。本文将分析两个项目:Alto Maipo和Los Condores水电项目,距离大约100公里安第斯山脉。将详细分析所采用的两种策略,因为一个项目正在使用开放式主束TBM加上广泛的地面支架,而另一个项目正在利用双屏蔽TBM和节段衬里。作者将研究两个隧道中遇到的TBM性能和地面条件,并且TBM选择和地面支持策略可能在每个隧道运行中具有哪些效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号