首页> 外文期刊>Concrete engineering international >Remote tunnelling project in the Chilean Andes
【24h】

Remote tunnelling project in the Chilean Andes

机译:智利安第斯山脉的远程隧道工程

获取原文
获取原文并翻译 | 示例
       

摘要

Main contractor Queiroz Galvao is using the machines, purchased from Atlas Copco Chile in Santiago, for sprayed concrete and forotherancillary works such as rock descaling.rnThe client for the project is Hidroelectrica La Higuera (HLH), a 50:50 joint venture formed by Pacific Hydro of Australia and Statkraft Norfund Power Invest of Norway to build, own and operate the 155MW run-of-the-river hydropower plant, located in the Tinguiririca Valley, about 150km south of Santiago.
机译:总承包商Queiroz Galvao正在使用从圣地亚哥的阿特拉斯·科普柯智利分公司购买的机器进行喷涂混凝土和其他辅助工程,例如岩石除垢。rn该项目的客户是Hidroelectrica La Higuera(HLH),这是太平洋公司以50:50的比例成立的合资企业澳大利亚水电公司和挪威挪威国家统计局(Statkraft Norfund Power Invest)在圣地亚哥南部约150公里处的廷吉里里卡山谷(Tinguiririca Valley)建造,拥有和运营155兆瓦的河道式水力发电厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号