首页> 外文会议>Rapid Excavation and Tunneling Conference >Material Flow Reconciliation: Risk Management for Pressurized Face Tunneling
【24h】

Material Flow Reconciliation: Risk Management for Pressurized Face Tunneling

机译:物质流动调节:加压面隧道风险管理

获取原文

摘要

Overexcavation during pressurized face tunneling is a risk factor with respect to unplanned surface deformation and damage to existing installations above the tunnel. Risk management typically includes surface and subsurface deformation monitoring of critical areas identified during planning and design. However, continuously reconciling material flows during the mining process is a risk management tool that allows recognizing and correcting causal trends before effects are observed. This paper describes the reconciliation methods for different TBM types, provides project examples from Seattle area tunnels, and discusses risk management implementation approaches involving the owner, designer, contractor, and third party asset holders.
机译:加压面部隧道的过度扫描是关于隧道上方的现有装置的无计划表面变形和损坏的风险因素。风险管理通常包括在规划和设计期间识别的关键区域的表面和地下变形监测。然而,在采矿过程中连续调整材料流动是一种风险管理工具,可以在观察到效果之前识别和纠正因果趋势。本文介绍了不同TBM类型的调节方法,提供了来自西雅图地区隧道的项目示例,并讨论了涉及所有者,设计师,承包商和第三方资产持有人的风险管理实施方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号