首页> 外文会议>Rapid Excavation and Tunneling Conference >Port Mann Water Supply Tunnel: Lessons for the Future
【24h】

Port Mann Water Supply Tunnel: Lessons for the Future

机译:港口曼德供水隧道:未来的课程

获取原文

摘要

After more than a decade of planning, design, and construction, the Port Mann Water Supply Tunnel was successfully brought into service in early 2017. The tunnel increases Metro Vancouver's (MV) capacity to meet water demand while increasing system reliability, and represents the first of several tunnel projects planned to improve seismic capacity of the system following a Maximum Credible Earthquake event. The contracting and management issues associated with delivering the project have been as complex and timeconsuming as some of the design and construction challenges. As well as explaining how the design and construction challenges were successfully addressed, the paper presents how Metro Vancouver approached contractor procurement through prequalification and negotiated proposal phases, presents the risk management approach and project team structure, and describes how the lessons learned on the project can be applied to future tunnel projects in the region.
机译:经过十多年的规划,设计和建设,港口曼德供水隧道于2017年初成功进入服务。隧道增加了地铁温哥华(MV)能力,以满足水需求,同时提高系统可靠性,代表第一个在最大可信地震事件之后,计划计划提高系统的地震能力的隧道项目。与交付项目相关的缔约和管理问题一直是复杂和时间的,作为一些设计和施工挑战。以及解释设计和施工挑战如何成功解决,本文提出了通过资格化和谈判提案阶段的地铁温哥华如何接近承包商采购,提出了风险管理方法和项目团队结构,并描述了如何在项目中学到的经验教训适用于该地区未来的隧道项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号