The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

机译:Microsoft项目在评估PAM 2006标准合同标准形式下延长时间的效力

获取原文

摘要

Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.
机译:时间等于金钱;它适用于建筑行业的时间非常重要。大多数标准合同形式提供合同条款,以确定与情景相关的时间和金钱,而延长时间(EOT)是其中之一。在环境和延误期间,承包商允许申请EOT以便在未经申请人征收的违约赔偿金(LD)的后续完成日期上填写工程。但是,索赔人和评估员都遇到了评估EOT的问题。本研究的目的是建议将Microsoft项目的用途作为评估与标准合同形式的EOT的工具,PAM 2006.定量方法适用于由架构和数量测量师(QS)组成的受访者收集关于评估EOT索赔的挑战数据以及Microsoft项目作为工具的有效性。该研究的发现突出显示,Microsoft项目可以作为执行EOT任务的基础,因为该软件可以用作数据库来存储对准备和评估EOT至关重要的方便信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号