首页> 外文学位 >An optimal contract strategy in managing extension of time provisions in building contracts.
【24h】

An optimal contract strategy in managing extension of time provisions in building contracts.

机译:管理建筑合同中时间规定的延长的最佳合同策略。

获取原文
获取原文并翻译 | 示例

摘要

Some employers tend to transfer as much time-related risk as possible to contractors by removing contractors' entitlements to Extension of Time (E.O.T.). However, not all these risk aversion provisions are legally enforceable or cost effective. This study aims at developing guiding principles for employers) to include legally sound E.O.T. provisions in contracts and providing a model for assessing the cost for transferring delaying risks for employers' consideration.;The first part of this study addresses the legal concern. Support is drawn from the literature and principles of law. In addition, eight professionals have been interviewed to understand their pragmatic considerations in practice. This part reveals that for delays caused by employers, omission of E.O.T. provisions may render time 'at large' and inappropriate deletion may be classified as unfair contract terms which may be unenforceable in courts. Employers should be aware of the legal rules and strike a balance between fairness to contractors and attainment of employers' project goals.;Risk allocation through contractual provisions involves financial considerations. In the second part addressing the financial concern, deletion of E.O.T. due to inclement weather is selected as the illustrative example. As contractors' pricing for risks in tenders determines how much the employers have to pay, a model is developed to find out contractors' behavioral pattern in pricing weather risk. This is done by investigating the relationships among the weather history, contractors' risk perception, attitudes and behaviors. The term 'situational variables' is further introduced to fill in the gaps between risk attitude and behavior.;Questionnaire data was collected from building contractors in Hong Kong. The survey reveals that contractors of different sizes would have different patterns of risk behaviors. Their behaviors would also be affected by different situational variables, however, they generally consider employers' reputation to honour payment on time, reasonableness of the amount of liquidated damages, etc. as very important factors. Regression formulae have been formulated to enable employers to assess the number of delaying days priced in tenders. The high predictability of the model has been confirmed by interviewing three contractors and by substituting the data of three real projects into the model.
机译:一些雇主倾向于通过取消承包商的延期(E.O.T.)权利,将尽可能多的与时间有关的风险转移给承包商。但是,并非所有这些风险规避条款在法律上都是可执行的或具有成本效益的。这项研究旨在为雇主制定指导原则,以包括合法的E.O.T.合同条款,并提供评估延迟风险转移成本的模型,供雇主考虑。本研究的第一部分解决法律问题。支持来自文学和法律原则。此外,还采访了八名专业人员,以了解他们在实践中的务实考虑。这部分表明,由于雇主造成的延误,省略了E.O.T.条款可能会浪费大量时间,而不适当的删除可能会被归类为不公平的合同条款,在法院可能无法执行。雇主应了解法律规定,并在对承包商的公平与实现雇主的项目目标之间取得平衡。通过合同条款分配风险涉及财务方面的考虑。在处理财务问题的第二部分中,删除E.O.T.由于恶劣天气而选择的示例。由于承包商对招标书中的风险定价决定了雇主必须支付的费用,因此开发了一个模型来找出承包商在天气风险定价中的行为模式。这是通过调查天气历史,承包商的风险感知,态度和行为之间的关系来完成的。进一步引入了“情境变量”一词,以填补风险态度和行为之间的空白。问卷调查数据是从香港的建筑承包商那里收集的。调查显示,不同规模的承包商将具有不同的风险行为模式。他们的行为也将受到不同情况变量的影响,但是,他们通常认为雇主的声誉以按时偿还货款,违约金数额的合理性等是非常重要的因素。制定了回归公式,使雇主能够评估标价中的延迟天数。通过采访三个承包商并将三个实际项目的数据代入模型,证实了该模型的高度可预测性。

著录项

  • 作者

    Au, Chung Yu Maria.;

  • 作者单位

    Hong Kong Polytechnic University (Hong Kong).;

  • 授予单位 Hong Kong Polytechnic University (Hong Kong).;
  • 学科 Law.;Business Administration Management.;Psychology Behavioral.
  • 学位 Ph.D.
  • 年度 2013
  • 页码 228 p.
  • 总页数 228
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号