首页> 外文会议>International Scientific Siberian Transport Forum >Operation of Infrastructure and Rolling Stock at Railway Polygon
【24h】

Operation of Infrastructure and Rolling Stock at Railway Polygon

机译:铁路多边形基础设施和滚动股的运作

获取原文

摘要

The article analyzes the state of transport infrastructure ensuring the required volume of transportation. The work employs the methods of marketing and strategic analysis and also the provisions on synthesis of adequate adaptive mechanisms with identification allowing to make the rational choice on the use of the infrastructure from a possible set of options, available resources and shippers needs. The carried-out SWOT analysis defined the risks and possible effectiveness of use of the single infrastructure of the railroads polygon regarding further possible additional costs. The transition to the polygon technology of the train traffic control allows JSC Russian Railways to organize rhythmic train traffic providing the ?gaps? for the whole polygon in a single section. The adaptation mechanism for the costs variance of the consolidated liability of the transportation process participants allowing to monitor primary variances synchronously with the infrastructure works performance and delivery is offered. The general algorithm of the model of integrative management of the infrastructure and traction resources is formalized and illustrated on the example of the railroads polygon. Their interaction is based on the results of integral estimation which unites a diverse quantity of indicators and estimating factors of the transportation process. The mathematical support of the cost value formation is implemented in ?Automated system of loading supervision of a production department?. The received results are integrated into ?Automated system of operational work supervision of the integrated centre of the infrastructure control? and adapted to transformation and effective use of the industry enterprises capacity.
机译:文章分析了交通运输基础设施,确保运输所需体积的状态。这项工作采用的营销和战略分析的方法,也对与识别使设计者能够在基础设施的使用从一组可能的选项,可用资源和货主需求的合理选择适当的适应机制合成的规定。携带出SWOT分析定义的多边形进一步就可能的额外费用的风险和使用铁路的单一基础设施的可能效果。火车交通管制的多边形技术的过渡允许JSC俄罗斯铁路公司组织有节奏的铁路交通提供?差距?在单节整个多边形。在运输过程中的参与者允许监控主要的综合负债成本变化的适应机制同步方差与基础设施工程性能和交付提供。基础设施和牵引资源的综合管理模式的一般算法形式化和铁路多边形的例子所示。它们的相互作用是基于哪个联的指标和运输过程中估计因子的不同量积分估计的结果。成本价值形成的数学支持吗?生产部门的监装的自动化系统中实现?接收到的结果都融入?基础设施控制的集成中心的业务工作监督的自动化系统?并适用于改造和有效利用行业的企业的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号