首页> 外文会议>Global Conference on Extractive Metallurgy >Integrated Pyrorefining of Lead at Teck's Trail Operations
【24h】

Integrated Pyrorefining of Lead at Teck's Trail Operations

机译:在Teck的Trail行动中综合Pyrowsfining

获取原文

摘要

The Trail smelter of Teck Metals Ltd. produces about 90,000 tonnes of lead per year through two stages of refining following KTVCET smelting. Bullion from the KTVCET furnace is first treated in a pyro-refining plant in preparation for Betts electrorefining which makes 99.99% pure lead. Pyro-refining consists of number of integrated unit operations to remove primarily copper, arsenic, antimony and tin. The operation of this plant to meet the specifications for electrorefining requires attention to bullion management and selective use of reagents. The processes used for pyro-refining are reviewed in terms of chemistry and control.
机译:Teck Metals Ltd.的小道冶炼厂每年生产约90,000吨铅,通过在KTVCET冶炼之后的两个精炼的两个阶段。来自KTVCET炉的金条首先用在溶细胞精炼厂中进行处理,为贝蒂电气精细进行准备,这使得99.99%纯铅。 Pyro-Refining由综合单元操作数量组成,以删除主要铜,砷,锑和锡。该工厂的操作以满足耐电​​线规范需要注意金条管理和选择性使用试剂。在化学和对照方面审查了用于热化的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号