首页> 外文会议>International Conference on Applied Mechanics, Materials and Manufacturing >A Numerical Study of the Impact of Tunnel Depth on Surface Displacement in Shield Tunnel Construction
【24h】

A Numerical Study of the Impact of Tunnel Depth on Surface Displacement in Shield Tunnel Construction

机译:隧道深度对盾构隧道施工表面位移的影响的数值研究

获取原文
获取外文期刊封面目录资料

摘要

Using 3d finite element method can simulate the process of shield tunnel construction. The paper studies the impact of different tunnel depth on the deformation of soil, when considering different excavation steps in the process of tunnel construction. The results show that the shallower the tunnel depth, and the greater the amount of the surface displacement during the tunnel construction. In the process of the tunnel excavation, the soil surface displacement in front of the shield machine is the result of superposition of the uplift and subsidence. When the tunnel depth increases, the surface displacement curve becomes smoother, and the rate of change becomes slower.
机译:使用3D有限元方法可以模拟屏蔽隧道施工过程。本文研究了不同隧道深度对土壤变形的影响,考虑到隧道施工过程中的不同挖掘步骤。结果表明,隧道深度较浅,隧道结构期间的表面位移量越大。在隧道挖掘过程中,屏蔽机前面的土壤表面位移是升起和沉降叠加的结果。当隧道深度增加时,表面位移曲线变得更光滑,并且变化率变慢。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号