In the process of building subways in many cities, the technology of shield tunneling has become more widely used. In large cities, it is inevitable for the tunnels to pass through the foundations of buildings or between deep piles of bridges. Due to the many restrictions on urban space in China, the clearance between two tunnels has also become smaller. Hence, it is an urgent technical problem to resolve the mutual influence of the close construction of two tunnels using shield technology. In this study, the shield construction project of two tunnels with a small clearance of 2.6 m has been analyzed. The project is between Tongdewei Station and Shangbu Station in the northern extension section of the Guangzhou Metro Line 8. The main parameters used in the analyses are the tunnel lining deformation and the ground settlement. The construction without and with the isolation pile reinforcement have been simulated numerically. The simulation results have been compared with the on-site monitoring data. Based on the comparison, it shows that with the reinforcement, the tunnel lining deformation and the ground settlement can be reduced significantly. The effect of subway shield construction on the construction of the first subway tunnel will significantly reduce. The deformation of the shield excavation net width and the mutual influence can also be greatly reduced. The findings from this study can be used as technical foundation and reference for the construction of similar projects, i.e. shield tunnel construction with a small clearance between tunnels.
机译:在许多城市建造地铁的过程中,盾构隧道技术已得到越来越广泛的应用。在大城市中,隧道不可避免地要穿过建筑物的地基或深厚的桥梁之间。由于中国城市空间的诸多限制,两条隧道之间的距离也越来越小。因此,利用屏蔽技术解决两条隧道紧密施工的相互影响是迫在眉睫的技术问题。在这项研究中,分析了两个隧道的盾构建设项目,该隧道的净空间隙为2.6 m。该项目位于广州地铁8号线北延段的同德围站与上埠站之间。分析中使用的主要参数是隧道衬砌变形和地面沉降。对没有和有隔离桩加固的施工过程进行了数值模拟。仿真结果已经与现场监测数据进行了比较。通过比较,可以看出,通过加固,可以大大减少隧道衬砌变形和地面沉降。地铁盾构施工对第一条地铁隧道的施工影响将大大降低。盾构开挖网宽度的变形和相互影响也可以大大减少。这项研究的结果可作为类似项目建设的技术基础和参考,即盾构隧道的施工,隧道之间的间隙很小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号