Study on Safety Measures for Construction of Foundation Pit Close to Existing Railway Lines

机译:现有铁路线靠近基坑施工安全措施研究

获取原文

摘要

The finite-element method is adopted to analyze the impact of foundation pit construction on close-by railway lines, and related measures are studied to ensure the safety of railway operation during the pit construction. Eventually, cost-effective reinforcement method is recommended, there for providing a reference for construction of similar foundation pit close to railway lines to determine reinforcement method. The conclusions indicate that under the existing structure design and basal reinforcement design of the foundation pit, the largest settlement of high-speed railway lines is 23.48mm, which does not meet the relative requirements. To reduce the settlement, three rows of high pressure jet grouting piles reinforcement outside the foundation pit and 0.15m away from waterproof curtain is recommended, and 18.0m is considered as the cost-effective reinforcement depth. With the effect of the proposed reinforcement measures, the largest settlement magnitude of high-speed railway subgrade is reduced by 25% to 14.0mm, which meets the relative requirement.
机译:采用有限元法分析基坑施工对铁路线路近铁路线的影响,研究了相关措施,以确保坑施工过程中的铁路运行安全。最终,建议使用经济高效的加固方法,为靠近铁路线的类似基坑构建提供参考以确定增强方法。结论表明,在现有的结构设计和基础坑的基础加固设计下,高速铁路线的最大沉降是23.48mm,这不符合相对要求。为了减少沉降,建议使用三排大型高压喷射灌浆桩加固,距离防水窗帘0.15米,18.0米被认为是成本效益的增强深度。随着拟议的加固措施的影响,高速铁路路基的最大沉降量减少了25%至14.0mm,符合相对要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号